Meanwhile, the wheelarch framing is being treated for corrosion and the aluminium stress panels are being fabricated.
Saturday, 5 February 2011
UCOC Lodekka 651 - further progress
Work continues to progress on UCOC Lodekka FS 651. The timberwork under the canopy was found to be rotten requiring the removal of the front nearside between deck panel to access the timbers. The offending section has been removed and sent to our specialist joinery contractors. Similarly, one of the timbers above the lower deck windows was also rotten, requiring a window pan and between deck panel to be removed to remedy.