Sunday, 18 March 2012

MD60 progress

No time has been lost in re-starting work on London Metropolitan MD60 for Ensignbus. Sections of the upper deck window rails have already been replaced in steel box section, preparing the between deck in advance of repanelling. On the upper deck, the floor covering is being prepared for new brown Treadmaster. The next steps include working down the vehicle to complete steel framework renewal and welding of zintec stress panelling.