As part of the work, the BusWorks has transposed the centre exit from nearside to offside, reduced the overall roof height to 4m, repanelled the buses and then completely resprayed them. In the picture shown, D525UGT awaited only its upper deck glazing to be fitted.
Friday, 13 January 2012
More Big Bus exports
As part of the work, the BusWorks has transposed the centre exit from nearside to offside, reduced the overall roof height to 4m, repanelled the buses and then completely resprayed them. In the picture shown, D525UGT awaited only its upper deck glazing to be fitted.